Taiwan 28 Nov 13 D4 - 01

Taiwan 28 Nov 13 D2 - 02

Taiwan 28 Nov 13 D2 - 01

SK Riverside Park 1 (15 May 2011)

SK Riverside Park 2 (15 May 2011)

SK Riverside Park 3 (15 May 2011)

SK Riverside Park 4 (15 May 2011)

16 October 2011

Hen Project Oxygen

Sun 16 Oct 2011: Swimming 10 lap.

15 May 2011

Cycling 5

Early Sat morning 6 plus go to Punggol River.
Up and down the river twice.
Should be about 10 km in total.
Manage to maintain average speed of about 21 km/h.

Then back to Serangoon River all the way to Lorong Halus bridge (did not cross bridge), and then back home.

Total about 25km.

Timing more than 1 1/2 hrs, no sure, forgotten.

11 May 2011

Cycling 4

Monday morning 9 May 5am started out - did not plan for it.

Started towards Punggol Park along Buangkok Drive.
Go around Punggol Park.
Then along Seragoon Pk Connector (see onemap.sg), then right at T-junction along Sengkang East Rd, then left along Sengkang East Ave.

At Sungei Punggol turn left, cycle along Punggol river all the way to the end, then U-turn to cycle all the way to the other end of the river towards the sea, the U-turn back to Sengkang East Ave, then back to Buangkok Drive.

Then cycle to the end of Serangoon Pk Connector along Hougang Ave 7, then back home.

total time = about 1 hr 15 min
total =about 21 km

Must learn to use the odometer on my bike next time.

07 May 2011

Cycling 3

Last night cycled towards Punggol - bad move -- got to take same path as people and cross many bus stops.
Go right to the end, then end up cutting across TPE along Punggol Road.
Turn right toward Sengkang Riverside Park, along Punggol River and back to near Pei Hua Sec.
Then all the way back home along the LRT Service Centre.

Next time, must avoid human traffic.

Total distance estimated from http://www.onemap.sg/ is 18 km.
Time taken - maybe about 1 hour plus?

Next time will note more accurately.

02 May 2011

Cycling 1&2

Taken purple path back and forth on 2 days - yesterday and the day before.



Behind SSS, Florida, along HG Ave 7. After back and forth yesterday, continue along Buangkok Drive (Punggol Park on my left).


Continued up to T-Junction, turn right to Sengkang East Road, then left to Sengkang East Ave towards Punggol River / Pei Hwa Sec.


Reach Punggol River (Sungei Punggol), then left (instead of right) and cycle along Punggol River, cutting across TPE from below.


Reach the END of PCN where i can see Punggol Marina and the Barrage.


Turned back to Sengkang Riverside Park, opposite the Anchorvale CC. Cycle along the Heavy Vehicle Park towards 2B's place at Blk 203.



Then back home.