Monday morning 9 May 5am started out - did not plan for it.
Started towards Punggol Park along Buangkok Drive.
Go around Punggol Park.
Then along Seragoon Pk Connector (see onemap.sg), then right at T-junction along Sengkang East Rd, then left along Sengkang East Ave.
At Sungei Punggol turn left, cycle along Punggol river all the way to the end, then U-turn to cycle all the way to the other end of the river towards the sea, the U-turn back to Sengkang East Ave, then back to Buangkok Drive.
Then cycle to the end of Serangoon Pk Connector along Hougang Ave 7, then back home.
total time = about 1 hr 15 min
total =about 21 km
Must learn to use the odometer on my bike next time.
11 May 2011
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment